- HOME /
Application: Palm oil mill effluent upgrade
| Operation since | Mar. 2021 |
| Location | Malaysia |
| Capacity | 45m3/h |
| Membrane Module | 300 pcs MSFSF4012T |
| Process flow | Pome with BOD3<200mg/L – CMAS Reactor– MBR – Final Discharge |
Feed water: BOD: <200mg/L, COD: <1500 mg/L, TSS: 200-500 mg/L, Oil&grease: <1mg/L
Permeate: BOD<20mg/L(Standard discharge), COD<800 mg/L, SS<10 mg/L(Standard discharge)
